Real things start to happen in the 3D world

We never imagined that the sight of a growling excavator destroying a beautiful meadow could trigger such an avalanche of good feelings: we are moving from dreams, plans, documents and projects to reality. Behind us are the choice of plot, the choice of architect and construction engineer, the design, the planning permission, the dispute with the neighbour and hundreds of hours of thought and discussion.
Admittedly, we are already six months behind the initial plan. And they said: siga-siga.

Main entrance to the property, from the top road.
Entrance ramp: road on the top.
After small landslide in February 2023 it bacame clear, we had to reinforce this part to support the road above.
This beautiful excavator is parked mostly on where future parking will be arranged.
The house will be on the right.
On the left new entrance to the plot, probably for concrete trucks.


Leave a comment

POSTS BY CategorY