Everything slowed down again.
The walls are waiting for decisions to be made about the position of the windows and lintels, but the truth is that the stonemasons have other jobs to do. Some stones have been prepared…

…but the 25 sqm of wall laid in May is all we have to show for it.

The electricity stopped due to an enormous offer. It’s twice the price in Denmark and four times more expensive than in Poland — around 250 euros for one electrical point. Anyway, we planned carefully all sockets, switches, lights, electrical matts, fans and AC.

The plumber disappeared.

The roof is incomplete for reasons unknown. Only one small roof has been built.

Another day, week later, covered with insulation:

Small progress with cour anglaise – the window has been ripped out.


The concrete technicians came once to install some board shuttering (last one…?) and a threshold (That’s one small step for man, one giant leap for mankind).