First floor – last columns | #week 49

Probably only few weeks separate us from the moment when the roofer and bricklayers can come in.

Only two weeks ago, we were able to walk through the bedrooms of level zero and have a little look around.

Apparently, the extra room (pictured below in the foreground) is quite large. It wasn’t originally designed, so we also had to update the planning permission.

The view from the terraces on the first floor does not disappoint.

And – breaking news – we have the brand new electric pole at the plot!

Meanwhile, it rains every other day in Corfu, which doesn’t make the work any easier.



Leave a comment

POSTS BY CategorY